Delivery of 2 units of 250 kW generators to Kramatorsk hospital
The project to ensure the reliability of power supply to the Kramatorsk Hospital through the delivery and installation of two powerful generators of 250 kW each.
Amount of work:
Vavilon-Group LLC company undertook a full cycle of work, from logistical planning to transportation and installation of two heavy generators to ensure uninterrupted operation of the medical facility.
Features of the Project:
The project is distinguished by a high degree of responsibility, because providing energy to critically important facilities, such as a hospital, is a priority and requires accuracy and reliability.
Task set:
The main goal of the project was to create an autonomous energy system capable of meeting the hospital's needs in the event of a power outage.
Realization:
The delivery of the generators required coordination with local authorities, careful route planning and ensuring safety during the transportation and lifting of the equipment.
Result:
Successfully delivered and installed generators significantly increased the hospital's level of preparedness for unforeseen situations, guaranteeing continuity of vital processes and patient safety.